Pladur Mallorca — hotel refurbishment since 2004 for Meliá, Iberostar, Riu, Barceló, Hipotels, Zafiro, Grupotel, H10, TRH, Universal, Be Live and Marina. 120 rooms in 8-10 weeks with 3-4 parallel crews. Knauf Fireboard EI-60/EI-90/EI-120 compartmentation (CTE-DB-SI), Placo Silence 50 dB DnT,A (CTE-HR), Glasroc H Ocean bathrooms and Aquapanel on beachfront. Tel: 627 829 723.

Hotel sector · Mallorca

Drywall for Hotels in Mallorca — 120 Rooms in 8-10 Weeks Refurbishment

Drywall hotel refurbishment in Mallorca: 120 rooms in 8-10 weeks during the October-April low season, with CTE-HR acoustic insulation, EI-60 fire compartmentation and timelines guaranteed by contract.

Benefits

Why choose drywall for your hotel refurbishment in Mallorca?

Mallorca's hotel sector operates in very tight refurbishment windows: the season closes on 1 November and reopens on 15 April, with the optimum between October and March. Drywall is the construction system that best fits this reality because it allows phased refurbishment with 3-4 parallel crews without shutting the whole hotel, generates minimal debris and is completed in half the time of masonry. At Pladur Mallorca we have worked with Meliá, Iberostar, Riu, Barceló, Hipotels, Zafiro, Grupotel, H10, TRH, Universal, Be Live and Marina since 2004, on 5-7 year room renovation cycles and 10-12 year full refurbishments.

"For public residential use, CTE DB-SI requires EI-60 floor-by-floor compartmentation and EI-90 in staircases; car-park sectors under 100 m² with Knauf Fireboard. CTE DB-HR requires 50 dB DnT,A between rooms and 45 dB toward corridors"

CTE DB-SI (Fire Safety) and CTE DB-HR (Protection against Noise) · RD 1371/2007

Throughput

120 rooms / 8-10 wks

3-4 parallel crews

Cleanliness

Dry construction

No dust or debris

CTE-DB-SI

EI-60 / EI-90 / EI-120

Corridors, stairs, car park

CTE-DB-HR

50 dB DnT,A

Placo Phonique/Silence rooms

Cycle

5-7 / 10-12 years

Rooms / full refurbishment

Savings

30-40%

Vs traditional masonry

Services

Specialised services for hotels in Mallorca

Solutions tailored to hotel refurbishment: throughput of 120 rooms in 8-10 weeks, certified CTE-DB-SI and CTE-HR, handover with per-day delay penalty (1-2% of daily revenue).

Room layout changes

Decoupled Placo Silence or Knauf Silentboard partitions with Rockwool 70 kg/m³ for 50-58 dB DnT,A between rooms. Create suites, extend bathrooms with Glasroc H Ocean or split double rooms into connecting units.

Placo false ceilings with LED

Recessed LED lighting in rooms, corridors and public areas (lobby, restaurant, spa). Accessible Placo or Knauf ceilings for maintenance access. Modern design that elevates the guest experience and cuts electricity use.

CTE-HR acoustic insulation

Placo Phonique / Placo Silence / Knauf Silentboard systems reaching 50-58 dB DnT,A between rooms and 45 dB toward corridors, meeting CTE-HR (RD 1371/2007) for public residential use. Rw certificate on handover.

Fire compartmentation

Knauf Fireboard or Placo Glasroc F in EI-60 corridors, EI-90 stairs and car-park sectors under 100 m² under CTE-DB-SI. Fire doors, evacuation ducts and EI certificate on handover.

Services concealment

Concealment of pipework, HVAC ducts and structured cabling with accessible inspection hatches for maintenance. Knauf Aquapanel on beachfront (first-line) facades exposed to salt air.

Structural fire protection

Steel structure protection with Knauf Fireboard, including Z275 hot-dip galvanisation and vapour barrier in wet areas. Technical documentation, EI certificates and justification memo.

Renovation calendar

  1. October Low (~40%)

    Partial closure, works begin

  2. November Very low (~20%)

    Main works phase

  3. Dec-January Minimum (~15%)

    Finishes and paint

  4. Feb-March Rising (~30%)

    Snagging and cleaning

  5. April Mid season

    Handover and opening

Planning

Optimal hotel renovation calendar

Low season in Mallorca (1 November-15 April, optimum October-March) is the hotel refurbishment window. Occupancy drops to 15-20% in core winter months, which allows entire floors to be refurbished in Playa de Palma, Cala Millor, Alcúdia, Pollença, Magaluf, Santa Ponsa or Sa Coma without significantly hitting revenue.

We recommend planning the refurbishment from September: on-site visit, quote approval and material reservation for Placo Silence, Knauf Fireboard, Glasroc H Ocean, Rockwool and Isover. Sea freight of boards and profiles from mainland Spain takes 1-2 weeks, and some technical products need up to 3 weeks, so placing orders early is key to meeting deadlines.

For large 120-room hotels we deploy 3-4 parallel crews on different floors and complete the refurbishment in 8-10 weeks, with margin for finishes, deep cleaning and pre-opening before Easter. For 60-300+ room hotels we scale throughput while preserving floor- and room-level traceability.

We offer contracts with a per-day delay penalty (1-2% of daily revenue): if we miss the agreed deadline we apply a discount. This guarantee is particularly valued by chains such as Meliá, Iberostar, Riu, Barceló, Hipotels, Zafiro, Grupotel, H10, TRH, Universal, Be Live and Marina that need absolute certainty on season opening dates.

Regulation

Applicable regulations for hotels in Mallorca (CTE-DB-SI and CTE-HR)

Hotel premises are subject to stricter regulations than private homes. The CTE classifies hotels as "public residential use" (RD 1371/2007), which entails specific fire-protection (CTE DB-SI) and acoustic (CTE DB-HR) requirements that drywall meets with the right Placo and Knauf configurations. Handover includes Rw acoustic certificates, EI fire-protection certificates and, in bathrooms and wet areas, Z275 hot-dip galvanisation plus vapour barrier and H1 class.

CTE DB-SI

EI-60 corridors, EI-90 stairs, car-park sectors under 100 m²

Knauf Fireboard or Placo Glasroc F in double layer: up to EI-120

CTE DB-HR

Between rooms: 50 dB DnT,A · corridors: 45 dB

Placo Silence / Knauf Silentboard + Rockwool 70 kg/m³: 52-58 dB Rw

CTE DB-SI

EI-60/EI-90 fire doors in corridors

Knauf Fireboard frames ready for certified EI doors

CTE DB-SI

Protected evacuation ducts and service shafts

Knauf Fireboard boxing, intumescent sealing and RF collars

Prices

Hotel drywall refurbishment price 2026

2026 prices, VAT excluded. Unit rates from €29/m² Placo ceilings, €45/m² Knauf partitions, €35/m² Isover thermal lining, €6/m² Rockwool acoustic material and €52/m² Knauf Fireboard compartmentation. Volume discounts from 10 rooms. Final price after free on-site visit.

Full Placo/Knauf room (partitions + ceiling + Rockwool)

From
2,500
To
4,500
Unit per room

Placo LED false ceiling in corridor (€29/m²)

From
29
To
45
Unit

Knauf Fireboard EI-60/EI-90 compartmentation (€52/m²)

From
52
To
85
Unit

Placo Silence acoustic lining 50 dB DnT,A

From
45
To
65
Unit

Volume discounts from 10 rooms onwards; chain-specific rates from 60 rooms.

See full pricing table

Yes. We work in phases floor by floor or in blocks of 15-25 rooms, with chains such as Meliá, Iberostar, Riu, Barceló, Hipotels, Zafiro and Grupotel. While one block is under renovation, the rest stays open. We install temporary acoustic screens, DIN ISO signage, strict hours (8am-5pm) and independent accesses to avoid guest paths. We coordinate with management and housekeeping.

2-4 working days per room depending on scope: Placo BA13 false ceiling with LEDs only (2 days), ceiling + Knauf acoustic wall lining (3 days) or full layout change with partitions (4 days). For a 120-room hotel we run 3-4 parallel teams and complete the refurb in 8-10 weeks, fitting the October-March refurbishment window. Staggered handover floor by floor.

Yes. We use Placo Pregyfeu or Knauf Fireboard fire-resistant boards type F/DF, reaching EI-60 to EI-120 depending on configuration. It meets CTE-DB-SI for hotel premises: minimum EI-60 between rooms and corridors, EI-90 in protected staircases and EI-120 for car park compartmentation (>100 m²). All products are classified Euroclass A1-A2 s1 d0 (reaction to fire). We deliver the Declaration of Performance (DoP) and signed datasheet.

DnT,A 50-58 dB with Knauf W112 double-board systems and 45-60 mm Isover Arena, exceeding the 50 dB CTE-HR minimum for public residential use (hotels). For premium suites we install W115 triple-board reaching 60-65 dB, 5-star chain level. Impact noise L'nT,w below 58 dB with Isover Soundphone floating floors under timber flooring.

Full renovation per room (partitions + ceiling + acoustic insulation): €2,500-4,500. Canonical unit prices: Placo BA13 false ceiling with LEDs in corridors €29/m², Knauf W112 partition €45/m², Isover acoustic insulation €6/m², EI-60 fire compartmentation €52/m². Volume discounts from 10 rooms (-5%) and from 40 rooms (-10%). Fixed quote per room type in 48-72h after site visit.

The refurbishment window is October-March, when occupancy drops from summer's 80% to 15-40% and many hotels close seasonally (Playa de Palma, Magaluf, Alcúdia). We recommend planning in June-July to reserve Placo/Knauf materials and teams. Meliá, Riu and Iberostar usually schedule refurbishments to start in November with delivery before Easter. High-season work only in isolated phases or rooms.

Glasroc H Ocean by Saint-Gobain, plasterboard with moisture-resistant core reinforced with fibreglass: below 5 % absorption after 2h immersion, suitable for 70-85% relative humidity environments (hotel bathrooms with continuous showering). Z275 galvanised screws, joints sealed with SikaBond sealant and Class 3 anti-damp paint. For beachfront hotels we add a Placo Vario vapour barrier and an outdoor ETICS+Aquapanel wall lining.

Contract with fixed deadline and a delay penalty clause (typically 0.5-1% of project value per day). We assign a dedicated site manager, a weekly per-room plan, early purchase of Placo/Knauf materials (local Palma stock) and a backup crew to recover slippage. Since 2004 we have delivered 98% of hotel projects on time, with no penalty triggered in the past 5 years.

Full dossier: Declaration of Performance (DoP) from Placo, Knauf, Saint-Gobain and Isover; datasheet with EI and Euroclass reaction-to-fire classification; signed installation certificate; as-built measurements; process photos (pre-partition, insulation, fire-proofing, finishes); written 2-5 year warranty per system. Documentation ready for Tourism Department inspection, fire brigade and chain audits (Meliá, Iberostar, Riu).

Yes. We have experience with Meliá, Iberostar, Riu, Barceló, Hipotels, Zafiro, Grupotel and Protur chains, plus independent boutique hotels in Palma, Deià, Sóller and Puerto Pollença. We support project managers, engineering firms and architects at design stage (compartmentation calculation, acoustic system selection) and during execution. B2B invoicing, framework contracts and tailored SLAs available.

Start today

Planning your hotel refurbishment?

Free quote in 24 hours. Timelines guaranteed by contract with 1-2% daily-revenue penalty clauses. 120 rooms in 8-10 weeks. Refurbishing hotels since 2004.